The original post: /r/datahoarder by /u/shanefergusonphoto on 2024-12-08 21:31:36.
Hiya All,
I’m using a Mac - Within GoodSync I can create a list of jobs and set each of them to run on a schedule. For example, the 1st job at 1am, the 2nd at 2am and so on.
However, if there is nothing to backup/sync the next job is waiting for up to an hour (or whatever the scheduled time is) to run.
I see that I can create a Job Group, and if I manually run this - each job runs in turn once the previous one has finished - no more waiting.
However, I can’t seem to find an option to schedule the Group to begin, like I could with individual jobs.
Does anyone know if/how this can be achieved?
Thanks :)
You must log in or register to comment.