• @[email protected]
    link
    fedilink
    English
    12 months ago
    1. An M Pro esque chip was also in the plans, but seemingly canceled? Or way behind AMD, at least. And OEMs have repeatedly rejected their GPU heavy designs like Broadwell eDRAM and the AMD collab chip, as they’re kinda idiots and Intel is at their mercy. And the laptop chips they are selling now are basically their best shot at an “M” chip and arguably one of their most decent products.

    Wasn’t Lunar Lake supposed to be this?

    • @[email protected]
      link
      fedilink
      English
      12 months ago

      It’s 128 bit. I’d say it needs a bigger GPU and a 256 bit bus to be “M2 Pro” class.